· 48-hour timing rule: Starts after sample arrival and confirmation of test objectives and conditions.
Faster decisions: quickly confirm feasibility and key risks before mass production
Repeatable process: standardized workflow with consistent evaluation
Actionable output: clear conclusion + recommended next steps
Traceability-ready: data logging and export supported (USB / Internet)
Within 48 hours, you will receive:
Test summary & conclusion (pass/fail or risk-based recommendation)
Key data sheet (test conditions + metrics + comparisons when applicable)
Photo/video record of critical results (when applicable)
Recommended process window / parameter suggestions (for welding & assembly projects)
Risk findings & improvement suggestions (root cause hints and next actions
Optional (based on project):
Raw data export
Weld data logging & export via USB / Internet
A/B comparison results (material / structure / process comparisons)
a.Time / Energy / Depth (displacement/collapse) mode recommendation
b. Appearance control: flash, indentation, whitening, wreckage
c. Joint stability: alignment, shifting, repeatability
d. Parameter window suggestion for stable production
a. Abrasion / friction screening
b. Thermal exposure / basic thermal cycling screening
c. Chemical exposure screening (basic)
If you are unsure whether your project fits within 48 hours, submit the request
and we’ll propose the best testing package.
a. Submit request (material, geometry, targets)
b. Sample receiving & check (ID marking, quantity, basic inspection)
c. Test execution (standardized procedure + photo/video record when needed)
d. Data review (verification & abnormal result check)
e. Conclusion delivery (summary + key data + recommendation)
c. Large Power Ultrasonic Welder
Q1: When does the 48-hour timer start?
After samples arrive and test objectives/conditions are confirmed.
Q2: How many samples should I send?
Typically 10–20 pcs, depending on geometry and targets.
We will confirm the exact quantity during evaluation.
Q3: Do you provide strength testing (pull / shear)?
Yes. We provide pull test / shear test screening with failure mode observation when required.
Q4: Can you validate sealing performance?
Yes. We provide air leak test screening when applicable to the part design.
Q5: Can you export test data?
Yes. Depending on the project, data can be provided as a summary or exported file. For welding,
USB / Internet data export is supported.
Your form fields are: Name / Phone / Email / Content / Verification Code
Please paste the following template into Content:
1. Product / model (if known):
2. Material:
3. Part size / thickness:
4. Application scenario:
5. Target requirements:
Strength target (pull/shear): ____ N
Sealing target (air leak / waterproof): ____
Appearance target (flash/mark control): ____
Collapse / assembly height target: ____ mm
6. Sample quantity available:
7. Photo / drawing / product link (if any):
8. Target deadline:
Tip: If you can share your drawing link and target values, we can deliver a more accurate recommendation within 48 hours.
Or contact us:
Email: michael@sztimeast.com
WhatsApp/Tel: +86-15989541416
Company Name: Shenzhen Timeast Cheng Precision Industry Co.,Ltd.
Sample shipping address:
3/F, Building 5,Huixin Intelligent Industrial Park, Xinhu, Guangming, Shenzhen,China 518107
Phone: +86-15989541416
E-mail: michael@sztimeast.com
Whatsapp:+86-15989541416
Add: 3/F, Building 5,Huixin Intelligent Industrial Park, Xinhu, Guangming, Shenzhen,China 518107
We chat